1: Rehabilitation works on flood section of Ogbunike – Ogidi Road
2: Construction Of Okpoko Roads;
– Obodoukwu-Owerri Road-2.8884Km.
-Oguagu-Ik Onuorah-Anumadu-Mgbuka Amazu-Owerri Roads -2.992 Km.
-EdehRoad-SchoolRoad-Awalite-Ojoto Street Junction – 0.576km.
-Umuobom Street(Ojoto St. Junction)-Adazi Abi St.-Owerri Roads-1.345km.
-Umunweke St.(Obofoukwu Junction)-Umeojiakor St.(Sch. Road Junction) -0.538Km.
-Awalite (Ojoto Junction)-Anumudu(Mgbuka Amazu Junction)-0.991Km.
-Uzii St.- Mission St.(Awalite Junction)- 0.538Km.. -Anumudu St. (ik Onuorah Junction)-GMO Road-0.350Km.
- Construction Of Umueze Anam-Mmiafa-Nzam Road (Section 2: Mmiafa-Nzam) with a Bridge.
- Rehabilitation/Construction of Amansea-Ebenebe-Ugbenu-Awba Ofemili-Umuerum-Omor Road Phase 1.
- Construction Of Amansea-Ndiukwuenu-Manu
Forest-Awa-Ufuma Road.
- Rehabilitation works on Flood Section of Isuofia-Igboukwu Road.
- Rehabilitation/Reconstruction Of Selected Roads In Onitsha North LGA
-Akpaka Roads- 2.896Km.
– Federal Housing Estate Kink Road – 0.973Km.
– Spur – 33 (Idoko Hotel Drive)- 0.585km.
-Akpaka – Nsugbe Road – 3.341Km.
- Rehabilitation Of failed carriage And Embarkment At Mmili John Section Of Oba-Ojoto Road/Dredging Of Mmili John River.
- Igboukwu – Ekwulobia with Spur to Isuofia Nanka.
- Ugwuagba Obosi – Awada Obosi.
- Ajalli – Akpu – Nwafija – Ufuma – Ogbunka Road…. 12. Decongestion Of Ekwulobia -Traffic (construction of flyover Bridge, Roads, Bus Terminus, Fuel Station , Security Building, Fire station and External works).
- Construction of some selected Roads in Awka Club (Abakaliki Road), Regina Caeli, Millennium industry -INEC
- Construction Of Isuofia-Nanka with Spur to Nanka/Off ObinAdimarah..
- Construction Of Oye-Agu Abagana-Uruegbu Nimo Road with Spur at Nimo Road.
- Construction Of Okpunoeze – Nnewi Hotel Road.
- Construction Of Ezira-Umuomaku-Enugwu-Umuonyia-Achina Road…
- Construction Of Ozubulu-Ihembosi-Ukpor Road.
- Revalidation of Ukpo-Umunoko-Nza Ozubulu Road.
- Construction of Afani-Ozubulu Road with a Bridge.
- Rehabilitation of A for Nnobi-Awka Etiti-Ichida-Toni Mass Filling Station after Nkwo Igbo Ukwu.
- Gully Erosion Control Works in Ebenator.
- Revalidation of Umuaguchi Eziama Erosion Road in Uli.
- Construction of Nigeria Street-Sokoto Road with 3mX4.5mX15m long water Crossing and 1.1m storm water channel.
- Revalidation of the construction of community Roads at Mbaukwu from St Lawrence Anglican Church-Ngene Mmiri Shrine-Iyi Ufuko Stream-Ogado Village.
- Construction Of Isaho Umuezeagu-Perm site NAUTH (Umudim).
- Construction Of Achina-Onne-Ogboji.
- Ifite Ogwari Road with a Spur.
- Savinovo-Umuofor-Bright street – Nkwo-Umuhu-Ubahuezike Road (LOT 1).
- Isuofia Roads (LOT B).
- Construction Of Nnokwa-Adazi Enu-Akwaeze Road.
- Construction of Igwe Ezechi Okoye Road at Ifitedunu, Dunukofia Local Government.
- Construction of Umuogbu Awka Flood control infrastructure and 3.872Km Road Network.
- Restoration works on Atani-Osamala-Ogwuikpele Road with restoration of Bridge Abutment and other hydraulic structures.
- Abutment and Embarkment restoration works at Nkissi Opi Bridge at Onitsha – Nsuge- Otuocha – Nsukka federal highway.